West Des Moines Development

West Des Moines Development

Proposed waterpark and amphitheater renderingConcept rendering
Agreement approved

Grand Experience

A proposed entertainment district with a July 2026 development agreement and a later reported amendment.

Grand Avenue corridor→
The existing mall siteExisting-site photograph
Planning / transition

Valley West Mall

Redevelopment planning follows a reported September 2026 sale of the existing mall.

1551 Valley West Drive→
Event-center exteriorArchitectural concept
Under construction

RecPlex Event Center

The city-owned sports and events addition is under construction. The facility anticipates opening in fall 2027.

6500 Grand Avenue→
Microsoft in West Des MoinesHistorical campus photograph
Campus-specific milestones

Microsoft campuses

Separate data-center campuses, operating permits and infrastructure investments across West Des Moines.

Multiple West Des Moines campuses→
Forest Place marketing lot map: numbered lots and historic sale markers, dated January 5, 2026; not current availability.Historical marketing plan
Public improvements accepted

Forest Place

A 101-lot subdivision with an approved final plat and accepted public improvements.

S. 81st Street / Stagecoach Drive→
An early expansion conceptEarly concept
Construction reported

Merchants Bonding

A three-story office addition, with construction reported in April 2026.

6700 Westown Parkway→
Historic Jordan House facade and front path in 2012.Historical neighboring context
Phased improvements

Legacy Woods

Nature and heritage improvements near the Jordan House, with an open arboretum trail and later amenities still planned.

Grand Avenue & Fuller Road→
An artist paints figures on the Night Life mural for Vivid Junction.Actual mural-making photograph
Phase 1 complete

Vivid Junction

Five walkway murals completed in fall 2026 begin a wider Valley Junction placemaking initiative.

Historic Valley Junction→
Students walking through the landscaped Plaza between buildings at Des Moines University's West Des Moines campus.Actual facility photograph
Open · completed 2023

Des Moines University campus

An 88-acre health-sciences campus that opened to students in June 2023, with space for future growth.

8025 Grand Avenue→
Historic Valley Junction entrance arch and Fifth Street streetscape in West Des Moines, photographed in 2009.Historical area photograph
Proposed · agreement approved

122 Fifth Street infill

A planned two-story restaurant and tavern building would replace a demolished structure in historic Valley Junction.

Valley Junction→
Phase II under construction

Southbranch Business Park

A light-industrial business park adds warehouse capacity along the city’s southern growth corridor.

South / Highway 5 corridor→
Val Air Ballroom entrance and historic marquee in October 2025.Actual project photograph
Completed 2024

Val Air Ballroom renovation

The historic ballroom’s renovation renewed its concert venue and added lower-level dining and tavern space.

Historic east / Ashworth corridor→
Open access · future amenities planned

Raccoon River East Greenway & 1st Street Access

A new riverfront recreation area south of Valley Junction offers a boat launch, with connected trails and further amenities planned.

Valley Junction / east riverfront→
Completed Athene Pedestrian Bridge spanning the Raccoon River, with its central sculptural tree canopy.Actual project photograph
Open since October 2024

Athene Pedestrian Bridge

A pedestrian and cycling bridge links Raccoon River Park with Walnut Woods State Park and the regional trail network.

Raccoon River Park / Walnut Woods→
Under construction · September 2026 update

12th & Vine Regional Stormwater Facility

A regional basin manages stormwater, with grading, drainage improvements and a trail.

Historic east / Valley Junction area→
Red pedestrian bridge and paved trail through the green Sugar Creek corridor.Existing-site photograph
Phase 2 open

Sugar Creek Greenway Trail

The greenway trail extends neighborhood connections in western West Des Moines.

Western neighborhoods / Kings Landing→
Planning framework

University Avenue Corridor

The city is exploring mixed-use redevelopment and improved walkability in an established office and retail corridor.

University Avenue / Westown→
Multiple construction phases

Water-main renewal

Replacement and road-linked water work renews the local distribution network across established neighborhoods and growth corridors.

Citywide water network→
Testing

88th Street aquifer storage and recovery

Aquifer storage and recovery work is in testing, with the latest progress report extending that phase into early January 2027.

Western water network→
A blue West Des Moines water tower viewed from a residential street.Historical infrastructure context
Completed work and planned renewals

Water-storage renewal

Tank and tower maintenance combines recent coating work with upcoming renewal and equipment projects.

Citywide water storage→
Design and contracted renewal

A.C. Ward water-treatment renewal

Facility renewal and modernization continue at A.C. Ward, which West Des Moines Water Works operates for the regional authority.

Local treatment infrastructure→
Design, expansion and transmission work

Regional water-supply projects

Central Iowa Water Works projects support the regional system supplying West Des Moines, including new treatment capacity and transmission improvements.

Regional projects serving West Des Moines→
Draft capital planning

Future water-network investments

The draft 2027 budget outlines future distribution, storage and treatment investment through 2036.

Local capital planning→
Workers install erosion-control material beside the Sugar Creek channel and a road bridge in West Des Moines.Historical infrastructure context
Construction and long-range planning

Wastewater capacity and renewal

Current regional sewer construction and long-range improvements include a planned future West Des Moines outfall project.

West Des Moines and regional system→
In development

Starling supportive housing

A hotel conversion planned to create 89 studio apartments with supportive services on Westown Parkway.

2701 Westown Parkway→
Raccoon River Park Boathouse and accessible dock beside Blue Heron Lake.Actual project photograph
Open amenities and future connections

Five Waters recreation program

Five Waters connects lake recreation, performances, river access and trails. The boathouse and Jamie Hurd Amphitheater opened in 2020; the Marathon Loop and river greenway continue through multiple phases.

Citywide parks and river corridors→
Recent rehabilitation and ongoing work

Sewer and stormwater renewal

City renewal programs maintain sanitary sewers, storm drains and streambanks. Recent work includes pipe and manhole rehabilitation, channel repairs and retirement of an older Grand Avenue sewer segment.

Citywide / Grand Avenue corridor→
Completed red-brick West Des Moines Water Works Distribution Shop exterior.Actual project photograph
Open · recent completion

Water Works Distribution Shop

The new distribution shop provides expanded workspace for the local water-distribution team. Staff were operating from the building by April 2026, with a ribbon cutting held April 15.

Railroad Avenue / Holiday Park→
Existing white Regency West3 office building with dark windows and central entrance.Existing-site photograph
Proposed · negotiations ongoing

Regency West redevelopment

A proposed mixed-use transformation of Regency West Office Park, combining work, dining, housing and public spaces.

4200–5000 Westown Parkway→